Hard water in the area caused severe calcite build-up on heating elements
Electric water heater elements failed every six weeks due to overheating from scale
Traditional mitigation relied on chemical softeners, with recurring costs for chemicals, labour, and maintenance
A catalytic alloy insert was installed in the cold-water and recirculating line of the hot water system
The spiral core triggered a change in how calcium carbonate formed, preventing hard calcite deposits
The system required no chemicals, salt, or power, and only minimal maintenance
After 18 months of operation, heating elements showed no significant calcite build-up
Failures were eliminated, compared to the pre-installation six-week cycle
At the courthouse, simple payback was less than two years compared to replacing failed elements
Against a conventional salt-based system, payback was immediate
Minimal O&M requirements (occasional cleaning where iron levels are high)
USA-after
USA-after
UK manufacturer
Achieving 12 months of scale-free performance in hard-water conditions

Achieving 12 months of scale-free performance in hard-water conditions

Replacing CO₂ dosing in paper manufacturing

Replacing CO₂ dosing in paper manufacturing

Eliminating shutdowns in pharmaceutical production

Eliminating shutdowns in pharmaceutical production

bellavista
Eliminating limescale in a coastal hospitality water system

Eliminating limescale in a coastal hospitality water system

Improving cooling efficiency at a Honda manufacturing plant

Improving cooling efficiency at a Honda manufacturing plant

Improving cooling system reliability at Daimler Truck

Improving cooling system reliability at Daimler Truck

Improving greenhouse performance in education facilities

Improving greenhouse performance in education facilities

plapasa
Improving cooling efficiency in industrial plastics manufacturing

Improving cooling efficiency in industrial plastics manufacturing

Protecting cooling circuits at a tile manufacturer

Protecting cooling circuits at a tile manufacturer

Citymall Colloid-a-tron
Preventing scale in building services systems

Preventing scale in building services systems

Let’s find your
ideal solution

Get in touch and find out how we can help you