Heavy scale deposits were forming in pump bleed pipes, a critical point in the process
Up arrow blue
To limit scale, Alier was dosing 3,000 kg of CO₂ daily (over three tonnes)
Up arrow blue
Despite this, pump breakdowns still occurred
Up arrow blue
Ongoing costs included purchasing and handling CO₂, unplanned downtime, and maintenance labour
Magcat
Up arrow blue
CO₂ dosing was gradually reduced and completely eliminated within three weeks
Up arrow blue
Years later, inspections confirmed no scale formation in pump bleed pipes
Up arrow blue
No breakdowns occurred, improving uptime and reliability of the pulp drying process
Up arrow blue
Cost savings from eliminating CO₂ dosing alone gave a payback period of less than five months
Up arrow blue
Additional benefits included avoided maintenance costs, uninterrupted production, and reduced environmental impact from no longer venting CO₂ to the atmosphere
Cotto logo
Protecting cooling circuits at a tile manufacturer

Protecting cooling circuits at a tile manufacturer

GSA logo and catalytic technology
US Government study validates catalytic technology

US Government study validates catalytic technology

Plapasa logo with Colloid-a-tron
Improving cooling efficiency in industrial plastics manufacturing

Improving cooling efficiency in industrial plastics manufacturing

Honda logo
Improving cooling efficiency at a Honda manufacturing plant

Improving cooling efficiency at a Honda manufacturing plant

UK flag with Magcat
Achieving 12 months of scale-free performance in hard-water conditions

Achieving 12 months of scale-free performance in hard-water conditions

AISD logo with Scaletron
Improving greenhouse performance in education facilities

Improving greenhouse performance in education facilities

Hosteria Bellavista logo with Scaletron
Eliminating limescale in a coastal hospitality water system

Eliminating limescale in a coastal hospitality water system

Daimler truck logo
Improving cooling system reliability at Daimler Truck

Improving cooling system reliability at Daimler Truck

Pfizer logo
Eliminating shutdowns in pharmaceutical production

Eliminating shutdowns in pharmaceutical production

Fiesta Scaletron
Reducing maintenance downtime in a busy restaurant

Reducing maintenance downtime in a busy restaurant

Let’s find your
ideal solution

Get in touch and find out how we can help you