Honda logo
Up arrow blue
Despite the installation of a costly softening and chemical dosing system, scale continued to form inside compressors and pipelines
Up arrow blue
Heavy deposits led to frequent maintenance, downtime, and reduced system reliability
Up arrow blue
Circulating pumps experienced pressure losses of 68%, resulting in an increased workload and energy demand
Up arrow blue
Ongoing costs included chemicals and salt, frequent descaling, part replacements, and higher electricity bills
Magcat
Up arrow blue
Pressure losses reduced from 68% to 45% within four weeks
Up arrow blue
Pump energy consumption dropped by 6.6%, cutting electricity costs
Up arrow blue
Existing scale deposits began to break down, restoring heat exchanger efficiency
Up arrow blue
Magcat removed the need for chemicals, reduced maintenance labour, and lowered overall running costs
before and after photo
before and after photo
Citymall logo with Colloid-a-tron
Preventing scale in building services systems

Preventing scale in building services systems

Alier logo
Replacing CO₂ dosing in paper manufacturing

Replacing CO₂ dosing in paper manufacturing

Cotto logo
Protecting cooling circuits at a tile manufacturer

Protecting cooling circuits at a tile manufacturer

Fiesta Scaletron
Reducing maintenance downtime in a busy restaurant

Reducing maintenance downtime in a busy restaurant

GSA logo and catalytic technology
US Government study validates catalytic technology

US Government study validates catalytic technology

The state of texas fort bend county logo with Colloid-a-tron
Restoring HVAC performance in a large education facility

Restoring HVAC performance in a large education facility

Daimler truck logo
Improving cooling system reliability at Daimler Truck

Improving cooling system reliability at Daimler Truck

WTC Scaletron
Eliminating scale and chemical cleaning in a commercial training kitchen

Eliminating scale and chemical cleaning in a commercial training kitchen

UK flag with Magcat
Achieving 12 months of scale-free performance in hard-water conditions

Achieving 12 months of scale-free performance in hard-water conditions

AISD logo with Scaletron
Improving greenhouse performance in education facilities

Improving greenhouse performance in education facilities

Let’s find your
ideal solution

Get in touch and find out how we can help you